Delfield N8273P Refrigerated Prep Tables
Delfield N8273P Refrigerated Prep Tables is backordered and will ship as soon as it is back in stock.
Documents
Related Searches
Reach out via chat, email, or phone—we're here to help make sure it's the right fit for your kitchen. Contact us for more information.
Description
Delfield Drop-In Frost Top – 72⅜ in.
Self-contained, stainless-steel, 1 in. raised frost surfaceTurn any counter run into an eye-catching, ice-cold merchandiser. This Delfield drop-in frost top provides a perfectly frosted deck for cakes, pastries, salads, sushi or grab-and-go beverages—without the mess of ice or forced-air wells.
Why you’ll love it
- 1 in. elevated heavy-gauge stainless-steel top keeps condensation off the counter.
- Full-perimeter drain trough with ½ in. drain speeds clean-up and prevents puddling.
- Generous 2 in. overhang creates a clean, integrated look.
- High-density polyurethane foam insulation locks the cold where it belongs.
- GreenGenius™ R290 refrigeration system delivers powerful cooling with low environmental impact.
- Factory-installed push-in perimeter gasket drops straight into new or existing cut-outs—no silicone bead required.
- On/Off toggle switch and 8 ft cord with NEMA 5-15P plug for true plug-and-play installation.
- Included stainless-steel louver for field-installed airflow.
- cULus & NSF certified for safe food contact and electrical compliance.
- Backed by Delfield’s 1-year parts & labor warranty.
At-a-glance specs
Exterior cut-out required | 72 3⁄8 in. × 25 in. (184 cm × 64 cm) |
---|---|
Display surface (raised top) | Approx. 65 in. × 18 in. (165 cm × 46 cm) |
Compressor | 1⁄3 HP, self-contained |
Refrigerant | R290 (eco-friendly propane blend) |
Electrical | 115 V / 60 Hz / 1 Ph, 5.0 A, NEMA 5-15P |
Clearance below counter | 8 in. (20 cm) to bottom of compressor assembly |
Top elevation | 1.68 in. (4 cm) above counter surface |
Drain connection | ½ in. ID stainless-steel |
Shipping weight | ≈ 210 lb (95 kg) |
Certifications | cULus, NSF 7 |
Warranty | 1-year parts & labor |
Quick install checklist
- Provide the listed cut-out and maintain 1 in. minimum airflow to the louvered side.
- Route the ½ in. drain to an appropriate floor sink or condensate evaporator.
- Plug into a dedicated 15 A, 120 V receptacle—no hard-wiring needed.
- Flip the toggle switch and allow 30-45 minutes for the surface to frost before loading product.
Dimensions and amperage reflect the most current factory data but may vary slightly by production run or optional accessories.